A clear gap is the daylight between two infill members: FROM the face of one batten, bar or slat TO the facing side of the next. It is the number a ball or a hand has to fit through, and the one most screening and pool rules talk about.
It is easy to mix up with centres, which run from the middle of one member to the middle of the next. Centres are the clear gap plus one member width, so a 65 mm batten at a 20 mm gap is at 85 mm centres.
In CAD60 a field named Gap (Batten Gap, Bar Gap, Picket Gap) is always the clear gap. Where a model can set the battens by their centres instead, that field says Centres.